Davis Besse

Oak Harbor, Ohio


At A Glance

stopwatch September 14, 2011

office Industrial

building Metal Framing and Drywall

Previous interior system contractor was removed from site for unknown reasons and OCP was asked to pick up where they left off.  This wall accomplished at all levels from trade workers to field supervision to office personnel.

Everything that entered the plant had to be inspected and have a chemistry tag clearance applied.  OCP framed and drywalled 2 four story stairwells and engineered the required scaffolding.  West elevation of building exterior had to be installed off of 40' scaffolding.


directleft Previous
Radisson Hotel/Park Inn


Next directright
Bob Evans Headquarters